




These artworks in glass are produced to meet all building code requirements where all-glass is specified. Every installation is manufactured specific to architectural criteria as defined by the architect or designer. Artwork is rendered onto drawings of the proposed opening for review and approval by the Owner. Glass panels are machined to accommodate your hardware, edge conditions, installation preferences, etc. and are installed by your glazing contractor. liquidoranges produces shop drawings for submission, review and approval prior to fabrication.
Typical lead time is approximately 6 to 8 weeks from approved artwork and shop drawings. Quotes are provided based on architect or designer drawings, specific to the project. Due to the many variables that may be included in an entrance design, we can not offer a "rule of thumb" cost.
All glass used by liquidoranges, unless otherwise specified, is PPG Starphire low-iron, Silver Certified "Cradle to Cradle" environmentally responsible. Low-Iron glass is optically much clearer than standard glass, rendering the artwork within the glass at the highest quality without any color shift.

